(860) 990-2332
DM tile LLC logoDM tile LLC
Discount 10% off labor over $5,000 · materials not included · ends January 1, 2027
Discount 10% off labor over $5,000 · materials not included · ends January 1, 2027
10 percent off qualifying labor over 5000 dollars before tax. Materials are not included. Offer ends January 1, 2027. Ask us if your project qualifies.
DM tile LLC installer removing a failed mortar shower pan and liner down to the framing during a shower repair in Newington, CT
10+ Yrs · Registered & Insured

Shower Retile vs Full Bathroom Remodel: Which One Does Your Bathroom Need?

Most shower problems need a retile, not a full bathroom remodel. But you cannot tell which one you need until someone opens the wall, because the thing that decides it is the shower pan, and the pan is hidden under the tile.

The Short Answer

The Size of the Job Gets Decided When the Wall Opens

Here is the honest version: the size of the job gets decided by what we find when we open the wall, not by what you hoped to find. That is a reason to open the wall and look, not a reason to guess now.

Two Paths, Side by Side

Retile Onto a Sound Substrate, or Rebuild the Whole Shower

Path A

Retile Onto a Sound Substrate

You keep the existing framing, the existing plumbing layout, and the existing shower footprint. We strip the tile and grout, address what is underneath, install a new waterproofing assembly, and set new tile.

Path B

Full Shower Rebuild, Usually With New Plumbing

The pan comes out, the walls come off, and the framing gets opened up. New drain, new supply lines, new backer, new pan, new tile.

The difference is not the finish. Both paths can end with the same tile on the wall. The difference is what has to be open while the work happens.

Why the Pan Is a Rebuild

New Waterproofing Cannot Be Tied Into Old Waterproofing

There is no way to bond a new membrane to a membrane that is eight years old and possibly already saturated. So once the pan comes out, the walls come off too.You cannot leave a wall tiled while you rebuild the thing it drains into.

A pan job sounds like a small job because only a few rows of tile are visible. It is not a small job.Once the pan has to come out, the wall waterproofing cannot be tied into the old membrane, so the wall comes off too. The labour is then the same labour as the full rebuild.People assume a pan job is a small job that fixes a big problem. It is not.

What You Can See Before Anything Is Opened

  • A soft floor near the tub, or one that feels spongy underfoot
  • A water stain on the ceiling in the room below
  • Tile that moves, crunches, or sounds hollow when you tap it
  • Grout that cracks in a line rather than in scattered spots
  • A puddle in the shower that never quite drains

If more than one of those is true, you are looking at water getting into the assembly, not at tile that needs to look better. Age is a weak signal. Failure is a strong signal.

Where Permits Come In

The Scope Decision and the Permit Decision Are the Same Decision

Connecticut exempts finish work. Tiling and countertops are on the state list of work that does not need a permit. Retiling onto a sound substrate usually falls in that bucket.A full rebuild with new plumbing does not. Plumbing permits are not exempt. A licensed plumber pulls that, not the tile setter.So the full rebuild adds a permit, an inspection, and a plumber's fee to your bill.

Which One We Recommend for Most People

Start With the Smaller Scope and Let What We Find Decide

For most people we recommend starting with the smaller scope and letting what we find decide. That is not a trick to move you onto a bigger bill. It is the reverse.Plenty of shower problems are a wall and grout issue that is repairable, and opening the wall is how you find out. Plenty of others are a pan problem, and if the pan has to go, going halfway is worse than going all the way.

If water is coming through the wall or the grout, it is often repairable. If it is coming through the pan, tile usually has to come up and it gets expensive. Homeowners cannot tell which they have, and almost nobody tells them.We tell you which one it is before you sign anything for the big version.

Before You Decide Anything

What to Ask Before You Decide Anything

  • Ask what happens if the pan turns out to be the problem. If the answer is vague, they have not thought about it.
  • Ask whether the price includes opening the wall. If it does not, the number you were given is not the number you will pay.
  • Ask what happens to the wall tile if the pan comes out. The honest answer is it comes off.
  • Ask what the flood test is. If they say they skip it, or they say ten minutes, ask why.

Google Reviews

What Connecticut Homeowners Say

Robert Lee

November 2026

Reasonable price Excellent workmanship! Great communication throughout, pricing was fair and transparent, and everything was cleaned afterwards. I liked how they went over the project beforehand. We discussed and clarified how we wanted everything to look, and when questions arose during installation, they checked in with me so there were no surprises and the final look and placement of everything was just the way I imagined. I will recommend them to family and friends in the future.
Photo from Robert Lee's Google review of DM tile LLC, blue subway tile kitchen backsplash behind a gas range and stainless hoodPhoto from Robert Lee's Google review of DM tile LLC, blue subway tile backsplash around a kitchen window with sink and glass-front cabinetsPhoto from Robert Lee's Google review of DM tile LLC, blue subway tile backsplash in a kitchen with gray cabinets and an arched window

Response from the owner

Thank. You Robert for your kind words . Really appreciated .

Posted on Google

Kelly A

August 2026

I can’t say enough good things about Daniel! Our kitchen backsplash came out absolutely beautiful. From the beginning, he was responsive, reliable, professional and genuinely easy to work with—which honestly feels like half the battle when hiring someone for your home! Daniel and the person working with him were incredibly clean throughout the entire process, cleaning and vacuuming everything when they finished. They were personable, respectful and clearly take a lot of pride in their work. We felt so comfortable with them that we didn’t think twice about leaving them in our home while we stepped out. Beautiful work, reliable, responsive and people you can genuinely trust in your home. I would recommend Daniel without hesitation - in fact, we recommended him to our friend to do his backsplash and he was also very happy with the work.
Photo from Kelly A's Google review of DM tile LLC, white shaker cabinets with light gray subway tile backsplashPhoto from Kelly A's Google review of DM tile LLC, subway tile backsplash close-up above the countertopPhoto from Kelly A's Google review of DM tile LLC, finished kitchen with new tile backsplash

Response from the owner

Thank you very much .

Posted on Google

Arlene Polzun

November 2026

Very professional. Communication excellent. Always returns call and texts promptly. Price for project was very fair.. I will hire them again. Cleaned up everything, left no mess had my half bath tiled and a new ceiling installed
Photo from Arlene Polzun's Google review of DM tile LLC, black and white octagon and dot tile floor in a laundry roomPhoto from Arlene Polzun's Google review of DM tile LLC, half bath walls and window during the work

Response from the owner

Thank you so much for the review! We're glad to hear you're happy with your new half bath tiling and ceiling installation, as well as our communication and cleanup.It was a pleasure working with you, and we look forward to working together again on your next project!

Posted on Google

Frequently Asked Questions

Shower Retile or Full Remodel: Questions

A retile onto a sound substrate is usually two to three working days on site. A full shower rebuild with new framing and new plumbing runs four to six working days.

Either way, the waterproofing has to be flood tested before a single tile goes on, and the grout and silicone need cure time after that.

Sometimes. If the old pan is still sound and the framing is dry, yes. If the pan has failed, no.

New tile over a failed pan hides the problem and the water still goes where it was going. That is why we open it and look before we quote.

Retiling onto a sound substrate does not need one. Tiling and counters are on the state list of work exempt from a building permit.

If the job turns out to need new plumbing, a new drain or a new valve, that is permitted work, and a licensed plumber pulls it, not us. We tell you which parts of your job need it before we start.

The honest answer is you cannot know from outside, because the deciding part is under the tile.

What you can look at: a soft floor near the tub, a stain on the ceiling below, tile that moves or sounds hollow, grout cracking in a line, or a puddle that never drains. Those are signs water is getting into the assembly.

Whether it is a repairable wall problem or a pan rebuild is what the demo tells us.

Still have questions? Call us at (860) 990-2332

Where this work gets done

Bathroom tile remodeling, Tile repair and grout work by DM tile LLC across Connecticut. Ask for a free estimate.

Not Sure Which One Your Shower Needs? Let's Open It and Look.

If you are in New Britain, Berlin, Newington, Plainville, Farmington, Avon or a nearby Connecticut town and need tile installation, bathroom remodeling, shower waterproofing, backsplash work, or floor tile installation, contact DM tile LLC today. Free estimates available.