
Shower Waterproofing in Farmington, CT
Waterproofed showers in Farmington's 1980s and 90s colonials, and in the older village houses where a shower was fitted into a wall that was never built for one.
Shower waterproofing in Farmington
Farmington's median home was built in 1980, so the showers being rebuilt here now are mostly the first ones the house ever had.
2,565 Farmington homes went up between 1980 and 1989, which is the decade of the flat liner pan and the clamping drain.
8,298 of Farmington's 11,151 occupied homes are owner-occupied, so the ceiling under a failed shower is usually the same owner's.
Farmington's historic district was listed in 1972 and Unionville has its own, and both review the outside of a house rather than a bathroom inside it.
Farmington charges $15 per $1,000 of work, takes applications online, and no longer issues blanket permits.
Waterproofing in Farmington is about 19 minutes from our base, off I-84.
Recent Work
Waterproofing photos from our jobs
All photos are from DM tile LLC installations. See the full gallery
Google Reviews
What Farmington Homeowners Say
Robert Lee
November 2026
Reasonable price Excellent workmanship! Great communication throughout, pricing was fair and transparent, and everything was cleaned afterwards. I liked how they went over the project beforehand. We discussed and clarified how we wanted everything to look, and when questions arose during installation, they checked in with me so there were no surprises and the final look and placement of everything was just the way I imagined. I will recommend them to family and friends in the future.
Response from the owner
Thank. You Robert for your kind words . Really appreciated .
Kelly A
August 2026
I can’t say enough good things about Daniel! Our kitchen backsplash came out absolutely beautiful. From the beginning, he was responsive, reliable, professional and genuinely easy to work with—which honestly feels like half the battle when hiring someone for your home! Daniel and the person working with him were incredibly clean throughout the entire process, cleaning and vacuuming everything when they finished. They were personable, respectful and clearly take a lot of pride in their work. We felt so comfortable with them that we didn’t think twice about leaving them in our home while we stepped out. Beautiful work, reliable, responsive and people you can genuinely trust in your home. I would recommend Daniel without hesitation - in fact, we recommended him to our friend to do his backsplash and he was also very happy with the work.
Response from the owner
Thank you very much .
Arlene Polzun
November 2026
Very professional. Communication excellent. Always returns call and texts promptly. Price for project was very fair.. I will hire them again. Cleaned up everything, left no mess had my half bath tiled and a new ceiling installed
Response from the owner
Thank you so much for the review! We're glad to hear you're happy with your new half bath tiling and ceiling installation, as well as our communication and cleanup.It was a pleasure working with you, and we look forward to working together again on your next project!
Waterproofing · Farmington
Farmington's newest showers are forty years old now
Farmington's median home was built in 1980 and 51% of its 11,837 housing units went up in 1980 or later. Those are the colonials off Route 4 and the streets behind Unionville. The original shower in a 1985 house is now forty years old, and it was built with a liner pan on a flat subfloor, mastic on greenboard, and a clamping drain.They fail the same way every time. The weep holes at the drain clog with mortar and soap, water stops draining out of the mortar bed, the bed stays wet, and the tile above it starts to sound hollow. By the time a stain shows on the ceiling below, the pan has been leaking for a while.The village end of town is the opposite problem. 1,211 of Farmington's homes are from 1939 or earlier, and in those houses the shower was fitted later into a space that was never designed around one.
Farmington and Unionville each run a local historic district commission. Both review exterior changes; interior tile does not go through them. What matters on our side is the frame behind the wall, not the review.For a newer Farmington shower the sequence is what people underestimate. Demolition and framing repair, the plumber's rough-in and inspection, cement board and a bonded membrane, a twenty-four-hour flood test, two to three days of tile, then grout and silicone. About seven working days on site, and the bathroom is usable the morning after the silicone cures.Farmington is nineteen minutes from our base off I-84, and the overnight test is the one appointment where that matters.
Not sure how much of this your home needs? Start here: the five layers behind a shower that lasts It takes five minutes and saves guessing.
In Farmington we waterproof every shower with a bonded system: Schluter-KERDI membrane, pre-sloped pans, curbs and a flood test before a single tile goes down.
Farmington Housing at a Glance
Hartford County
- Homes
- 11,837
- Median year built
- 1980
- Built before 1960
- 25%
- Built 1980 or later
- 51%
- Single-family detached
- 65%
- In 2-4 unit buildings
- 11%
- In 5+ unit buildings
- 14%
- Owner-occupied
- 74%
- From our base
- ≈19 min
Source: U.S. Census Bureau, ACS 2020-2024 5-year estimates. ZIP codes 06032, 06085.
What we find in Farmington showers
Clogged weep holes
A 1980s clamping drain drains the mortar bed through small weep holes at the flange, and they block with mortar and soap over time. Once they do, the bed holds water permanently and never dries out between showers.
Greenboard from the back
The wall build of that decade was moisture-resistant drywall under mastic. It fails from the back, so the shower side can look intact while the studs behind it are black. We check the back of the wall wherever it is accessible.
Old village walls
In the Farmington and Unionville districts the framing is rough-sawn and there is no cavity depth to spare. We furr the wall flat and lose the inch, rather than bond a membrane to a surface that moves with the seasons.
Permits in Farmington
Does this work need a permit?
Under the 2022 Connecticut State Building Code (§R105.2), tiling, cabinets, countertops and similar finish work that involves no structural change is exempt from a building permit.Plumbing changes such as a new valve or a moved drain, and any electrical work, are permitted separately by the licensed plumber or electrician who performs them. We tell you which items in your scope apply before work starts.
Where permits are filed
Hartford County
Town of Farmington, Building Division
20 Monteith Drive, Farmington, CT 06032
Tel. 860-675-2315
The town publishes two lines: 860-675-2315 is the Building Department, the Building Official and the inspections line, and 860-675-2305 is the Engineering Division and Town Engineer.
Official Farmington building department pageFrequently Asked Questions
Shower Waterproofing in Farmington: Questions
Ours. Daniel and his own crew do the tile work on every Farmington waterproofing job. We do not hand your job to a third-party installer, so the people who quote it are the people who set it.
We are 19 minutes from Farmington, so the same crew can be on your job every day of the install, and you deal with one company from the estimate through the final clean-up.
They review exterior work: siding, windows, roofs, additions and anything visible from the street. An interior bathroom is not in front of them.
If your project adds a vent, a skylight or anything that changes the outside of the house, that part does go through the commission, and it is worth asking before the design is fixed.
Yes, and it is usually where these showers fail. A bench built as a separate box on top of the pan leaves a joint at its base that water sits against.
The bench is built into the membrane instead: framed, covered in cement board, and wrapped so the membrane runs continuously from the pan up over the seat and onto the wall behind it.
Yes. A pan that leaks slowly evaporates between showers and never makes a wet stain; it makes a ring or a brown mark that grows, and a musty smell in the room below.
Soft or hollow-sounding tile at the shower floor, and grout at the floor line that keeps cracking, are the earlier signs and they are easier to act on.
Tile and waterproofing are exempt from a building permit under the 2022 Connecticut State Building Code. Drain and valve work is plumbing, and that permit belongs to the licensed plumber doing it.
The office is the Farmington Building Division at 20 Monteith Drive, 860-675-2315. Applications go in online, inspections are booked on the same number, work is charged at $15 per $1,000, and the town no longer accepts blanket permits.
We build the pan, then go over it with a bonded waterproofing membrane such as a Schluter-KERDI style sheet or a liquid-applied one where the geometry calls for it.
The membrane runs over the pan, up the walls, around the curb, and over every seam, corner and valve penetration, and we hold a twenty-four-hour flood test before any tile goes down.
If a drop moves, we find it while it is still inexpensive to fix.
Only sometimes, and only when the old tile passes the checks: solidly bonded everywhere when you tap it, flat, and structurally sound, with enough give at the outlets, counters and doors to absorb the added thickness.
When it fails any of those, tiling over it locks the problem in. On a wet area we almost always take it down to the substrate instead.
Still have questions? Call us at (860) 990-2332
Guides
Waterproofing Questions, Answered
The questions homeowners ask us before the estimate. Read them before you book anyone, then call us with your questions.
Showers
What Goes Behind Shower Tile, and Why It Decides Whether the Shower Lasts
The pan, the membrane, the backer board, the grout and the tile. Five layers, and the one nobody sees is the one that decides how long the shower lasts.
Technical
Preparing a Subfloor for Tile
What a subfloor has to be before tile goes on, the common failures, and the tile problems that no amount of good tile can fix.
Permits
Do I Need a Permit for a Bathroom Remodel in Connecticut?
What the state code exempts, what needs a trade permit, and why a tile job and a plumbing job are not the same job. Read this before you pull anything off a wall.
How we work
Our Tile Installation Process, Step by Step
The whole sequence, from the first visit to the last silicone joint. Substrate prep, waterproofing, layout, setting, grout. No steps skipped.
More Tile Services in Farmington
The same careful work, for every surface in your Farmington home.
Waterproofing in Nearby Towns
Local crews, same standard, across Connecticut.

Shower Waterproofing in Farmington? Get Your Free Estimate.
If you are in New Britain, Berlin, Newington, Plainville, Farmington, Avon or a nearby Connecticut town and need tile installation, bathroom remodeling, shower waterproofing, backsplash work, or floor tile installation, contact DM tile LLC today. Free estimates available.







