
Shower Waterproofing in Newington, CT
Waterproofed, flood-tested showers in Newington's 1960s and 70s capes and ranches, where the original stall is around fifty years old and the pan under it has never been opened.
Shower waterproofing in Newington
Newington's median home went up in 1967, and where a shower is opened for waterproofing the framing and the pan under it are from that build.
2,587 of Newington's 13,577 homes were built in the 1970s, which is the decade the liner pan in most of these stalls dates from.
2,152 of Newington's homes are attached, so a shower that leaks has a second household's ceiling under it.
Newington Junction North was listed on the National Register in 1987, and where a shower in that row is opened the wall behind it is plaster on lath.
Building applications in Newington are filed or tracked online, and the counter is at 200 Garfield Street.
Waterproofing in Newington is about 13 minutes from our base, and the quote covers the pan and the floor below it.
Recent Work
Waterproofing photos from our jobs
All photos are from DM tile LLC installations. See the full gallery
Google Reviews
What Newington Homeowners Say
Robert Lee
November 2026
Reasonable price Excellent workmanship! Great communication throughout, pricing was fair and transparent, and everything was cleaned afterwards. I liked how they went over the project beforehand. We discussed and clarified how we wanted everything to look, and when questions arose during installation, they checked in with me so there were no surprises and the final look and placement of everything was just the way I imagined. I will recommend them to family and friends in the future.
Response from the owner
Thank. You Robert for your kind words . Really appreciated .
Kelly A
August 2026
I can’t say enough good things about Daniel! Our kitchen backsplash came out absolutely beautiful. From the beginning, he was responsive, reliable, professional and genuinely easy to work with—which honestly feels like half the battle when hiring someone for your home! Daniel and the person working with him were incredibly clean throughout the entire process, cleaning and vacuuming everything when they finished. They were personable, respectful and clearly take a lot of pride in their work. We felt so comfortable with them that we didn’t think twice about leaving them in our home while we stepped out. Beautiful work, reliable, responsive and people you can genuinely trust in your home. I would recommend Daniel without hesitation - in fact, we recommended him to our friend to do his backsplash and he was also very happy with the work.
Response from the owner
Thank you very much .
Arlene Polzun
November 2026
Very professional. Communication excellent. Always returns call and texts promptly. Price for project was very fair.. I will hire them again. Cleaned up everything, left no mess had my half bath tiled and a new ceiling installed
Response from the owner
Thank you so much for the review! We're glad to hear you're happy with your new half bath tiling and ceiling installation, as well as our communication and cleanup.It was a pleasure working with you, and we look forward to working together again on your next project!
Waterproofing · Newington
Newington showers were built in the 1960s and 70s, and that is the pan we are opening
Newington's housing has a median year built of 1967, and 59% of the town's 13,577 homes went up between 1950 and 1979. They are the capes and ranches off the Berlin line, around Mill Pond and out toward Elm Hill. In most of them the primary stall is the one that came with the house.That stall was built the way it was done then: a mortar pan over a PVC liner laid flat on the subfloor with no pre-slope, mastic-set four-inch tile on greenboard, and a clamping drain. None of that was built to stay dry. It was built to send water toward the drain, and to tolerate the water that did not get there.Fifty years of that and the mortar under the tile is holding water it cannot lose. We open a section before we price anything, because a substrate we have not looked at is a substrate we cannot cost.
What goes back is a different kind of build, not a better version of the old one. The pan comes out to the subfloor. The drain is replaced with one that will take a bonding flange. A pre-sloped pan is bonded to that flange, a sheet membrane runs up the walls and out over the bathroom floor, and every seam, corner and pipe penetration is banded before it is buried.Then the pan holds water for twenty-four hours with the level marked, and nothing gets tiled until it does. In the 16% of Newington homes that are attached, that test is the whole point of the job.Newington is thirteen minutes from our base, so coming back the next morning to look at a water line is a short drive, not a favour.
Not sure how much of this your home needs? Start here: the five layers behind a shower that lasts It takes five minutes and saves guessing.
In Newington we waterproof every shower with a bonded system: Schluter-KERDI membrane, pre-sloped pans, curbs and a flood test before a single tile goes down.
Newington Housing at a Glance
Hartford County
- Homes
- 13,577
- Median year built
- 1967
- Built before 1960
- 36%
- Built 1980 or later
- 25%
- Single-family detached
- 62%
- In 2-4 unit buildings
- 8%
- In 5+ unit buildings
- 14%
- Owner-occupied
- 78%
- From our base
- ≈13 min
Source: U.S. Census Bureau, ACS 2020-2024 5-year estimates. ZIP codes 06111.
What we find behind a Newington shower
A liner with no slope under it
1960s and 70s pans were lined, but the liner lay flat on the subfloor, so water collected in the mortar bed instead of running to the drain. That bed is removed rather than tiled over; covering it only keeps the water where it already is.
Greenboard behind mastic
Moisture-resistant drywall is not waterproof, and it fails from the back where you cannot see it. In these houses the wall usually looks sound from the shower side and the studs behind it are dark. The walls come off to the studs.
The drain and the joists
A 1960s clamping drain rarely accepts a bonding flange, and the floor framing in this stock is often 2x8 at sixteen inches. Both are checked while the floor is open, before the new pan is set, because both are cheap now and expensive later.
Permits in Newington
Does this work need a permit?
Under the 2022 Connecticut State Building Code (§R105.2), tiling, cabinets, countertops and similar finish work that involves no structural change is exempt from a building permit.Plumbing changes such as a new valve or a moved drain, and any electrical work, are permitted separately by the licensed plumber or electrician who performs them. We tell you which items in your scope apply before work starts.
Where permits are filed
Hartford County
Town of Newington, Building Department
Town Hall, 200 Garfield Street, Newington, CT 06111
Tel. 860-665-8580
Permits can be filed in person, by mail or through the town's Online Permit Center; since July 2025 the fee is $50 for work up to $3,000, then $15 per $1,000.
Official Newington building department pageFrequently Asked Questions
Shower Waterproofing in Newington: Questions
Ours. Daniel and his own crew do the tile work on every Newington waterproofing job. We do not hand your job to a third-party installer, so the people who quote it are the people who set it.
We are 13 minutes from Newington, so the same crew can be on your job every day of the install, and you deal with one company from the estimate through the final clean-up.
Sometimes they are the same problem. Tile loosening at the outside edge of a shower floor usually means water has been getting under it from the pan or the door threshold for a while, and the thin-set has given up.
Sometimes it is only a bad bond from the original install. We can tell the two apart by lifting one tile and checking the mortar and the board under it, and we will tell you which one you have before quoting anything.
Grout at the floor-to-wall joint that will not stay put, a smell that comes back after cleaning, tiles at the bottom course that sound hollow, soft or stained drywall on the far side of the wall, or a stain on the ceiling below.
Any one of those is worth a look. Two of them usually means the pan is done.
No. A bonded membrane has to sit on the substrate, under the tile, continuous with the drain flange and up the walls. Anything painted or rolled over existing tile is a coating on the finish, not a waterproofing layer.
If your tile and pan are sound and the problem is a failed silicone joint at the curb or the wall, that is a repair and we will do that instead.
The waterproofing and the tile are finish work and exempt from a building permit under the 2022 Connecticut State Building Code. Newington's own page makes the point that an exemption does not authorise work done against the code, which is fair.
Replacing the drain or the valve is plumbing, permitted by the plumber who does it, through the Town of Newington Building Department at Town Hall, 200 Garfield Street. Permits are filed in person, by mail or through the town's online permit centre; since July 2025 the fee is $50 up to $3,000 of work, then $15 per $1,000.
We build the pan, then go over it with a bonded waterproofing membrane such as a Schluter-KERDI style sheet or a liquid-applied one where the geometry calls for it.
The membrane runs over the pan, up the walls, around the curb, and over every seam, corner and valve penetration, and we hold a twenty-four-hour flood test before any tile goes down.
If a drop moves, we find it while it is still inexpensive to fix.
Only sometimes, and only when the old tile passes the checks: solidly bonded everywhere when you tap it, flat, and structurally sound, with enough give at the outlets, counters and doors to absorb the added thickness.
When it fails any of those, tiling over it locks the problem in. On a wet area we almost always take it down to the substrate instead.
Still have questions? Call us at (860) 990-2332
Guides
Waterproofing Questions, Answered
The questions homeowners ask us before the estimate. Read them before you book anyone, then call us with your questions.
Showers
What Goes Behind Shower Tile, and Why It Decides Whether the Shower Lasts
The pan, the membrane, the backer board, the grout and the tile. Five layers, and the one nobody sees is the one that decides how long the shower lasts.
Technical
Preparing a Subfloor for Tile
What a subfloor has to be before tile goes on, the common failures, and the tile problems that no amount of good tile can fix.
Permits
Do I Need a Permit for a Bathroom Remodel in Connecticut?
What the state code exempts, what needs a trade permit, and why a tile job and a plumbing job are not the same job. Read this before you pull anything off a wall.
How we work
Our Tile Installation Process, Step by Step
The whole sequence, from the first visit to the last silicone joint. Substrate prep, waterproofing, layout, setting, grout. No steps skipped.
More Tile Services in Newington
The same careful work, for every surface in your Newington home.
Waterproofing in Nearby Towns
Local crews, same standard, across Connecticut.

Shower Waterproofing in Newington? Get Your Free Estimate.
If you are in New Britain, Berlin, Newington, Plainville, Farmington, Avon or a nearby Connecticut town and need tile installation, bathroom remodeling, shower waterproofing, backsplash work, or floor tile installation, contact DM tile LLC today. Free estimates available.







