
Shower Waterproofing in Plainville, CT
Shower waterproofing in Plainville's post-war capes and split-levels, and in the Campground cottages that were built on brick piers a century ago.
Shower waterproofing in Plainville
Plainville's median home went up in 1971, and where a shower is taken out for waterproofing the joists under it are usually 2x8 at sixteen inches.
1,687 Plainville homes were built in the 1980s and 808 before 1940, so the town has both a liner-pan stock and an older plaster one.
648 of Plainville's homes sit in buildings of five to nine units, where a shower failure reaches a neighbour before it reaches the owner.
The New Haven District Campground was listed on the National Register in 1980, and its cottages are frame on brick stilts with no floor under them.
Plainville stopped taking paper permits; every building application goes through the town's online system.
Waterproofing in Plainville is about 10 minutes from our base, the shortest drive on the route.
Recent Work
Waterproofing photos from our jobs
All photos are from DM tile LLC installations. See the full gallery
Google Reviews
What Plainville Homeowners Say
Robert Lee
November 2026
Reasonable price Excellent workmanship! Great communication throughout, pricing was fair and transparent, and everything was cleaned afterwards. I liked how they went over the project beforehand. We discussed and clarified how we wanted everything to look, and when questions arose during installation, they checked in with me so there were no surprises and the final look and placement of everything was just the way I imagined. I will recommend them to family and friends in the future.
Response from the owner
Thank. You Robert for your kind words . Really appreciated .
Kelly A
August 2026
I can’t say enough good things about Daniel! Our kitchen backsplash came out absolutely beautiful. From the beginning, he was responsive, reliable, professional and genuinely easy to work with—which honestly feels like half the battle when hiring someone for your home! Daniel and the person working with him were incredibly clean throughout the entire process, cleaning and vacuuming everything when they finished. They were personable, respectful and clearly take a lot of pride in their work. We felt so comfortable with them that we didn’t think twice about leaving them in our home while we stepped out. Beautiful work, reliable, responsive and people you can genuinely trust in your home. I would recommend Daniel without hesitation - in fact, we recommended him to our friend to do his backsplash and he was also very happy with the work.
Response from the owner
Thank you very much .
Arlene Polzun
November 2026
Very professional. Communication excellent. Always returns call and texts promptly. Price for project was very fair.. I will hire them again. Cleaned up everything, left no mess had my half bath tiled and a new ceiling installed
Response from the owner
Thank you so much for the review! We're glad to hear you're happy with your new half bath tiling and ceiling installation, as well as our communication and cleanup.It was a pleasure working with you, and we look forward to working together again on your next project!
Waterproofing · Plainville
Plainville's showers sit on 1950s floors that were never built for a flood test
Half of Plainville's 8,588 homes went up between 1950 and 1979, and 32% of them predate 1960. The capes and split-levels along Route 10 and Route 177 were framed with 2x8 joists at sixteen inches, which is a fine floor and a marginal tile floor.The Campground is its own case. The New Haven District Campground cottages are simple frame buildings set on brick stilts, listed on the National Register in 1980. Small stalls, thin walls, and a floor sitting above open air. There is nothing under it to catch a leak, so the waterproofing is the only thing keeping water out of the frame.In the split-levels the shower usually sits over a finished lower level, so the pan and the drain are above a room you use every day.
We check two things before demolition in Plainville: whether the drain can be reached from below, and what the floor does under load. If the drain is reachable from underneath, the plumber's rough-in and the flood test happen without opening your ceiling, and that saves time and mess.The build itself is the one we use everywhere: pan out to the subfloor, new drain with a bonding flange, a pre-sloped pan bonded to it, a bonded membrane on the pan and up the walls, banded seams and collars, and twenty-four hours of standing water before the first tile.Plainville is ten minutes from our base, the shortest run on our route.
Not sure how much of this your home needs? Start here: the five layers behind a shower that lasts It takes five minutes and saves guessing.
In Plainville we waterproof every shower with a bonded system: Schluter-KERDI membrane, pre-sloped pans, curbs and a flood test before a single tile goes down.
Plainville Housing at a Glance
Hartford County
- Homes
- 8,588
- Median year built
- 1971
- Built before 1960
- 32%
- Built 1980 or later
- 34%
- Single-family detached
- 55%
- In 2-4 unit buildings
- 18%
- In 5+ unit buildings
- 20%
- Owner-occupied
- 68%
- From our base
- ≈10 min
Source: U.S. Census Bureau, ACS 2020-2024 5-year estimates. ZIP codes 06062.
What we check in a Plainville shower
Joists under a tile floor
2x8 at sixteen inches passes for a bathroom floor and fails for a heavy tile assembly over a long span. We check deflection against the TCNA limit before the pan goes in, and block or sister the joists where the span does not make it.
Access from the lower level
In a split-level the drain is often reachable from the finished room below. We look for that first, because a drain replaced from underneath saves opening a ceiling and makes the flood test easy to inspect from the same side.
Campground cottages
Frame walls on brick piers, small footprints, floors that have moved. The membrane gets specified first and the tile laid out to fit it rather than the other way round, because in a building on stilts there is no second chance at the ceiling.
Permits in Plainville
Does this work need a permit?
Under the 2022 Connecticut State Building Code (§R105.2), tiling, cabinets, countertops and similar finish work that involves no structural change is exempt from a building permit.Plumbing changes such as a new valve or a moved drain, and any electrical work, are permitted separately by the licensed plumber or electrician who performs them. We tell you which items in your scope apply before work starts.
Where permits are filed
Hartford County
Town of Plainville, Building Department
1 Central Square, Room 100, Plainville, CT 06062
Tel. 860-793-0221
The town no longer accepts paper permits: every application goes through the ViewPoint Cloud (OpenGov) system, and inspections are booked on 860-793-0221, ext. 7175.
Official Plainville building department pageFrequently Asked Questions
Shower Waterproofing in Plainville: Questions
Ours. Daniel and his own crew do the tile work on every Plainville waterproofing job. We do not hand your job to a third-party installer, so the people who quote it are the people who set it.
We are 10 minutes from Plainville, so the same crew can be on your job every day of the install, and you deal with one company from the estimate through the final clean-up.
Yes, and that is usually the point. The frame and the footprint stay as they are; what changes is what is behind the tile.
The wall gets furred flat, cement board and a bonded membrane go on, and the pan is rebuilt with a pre-slope and a new drain flange. The tile, the trim and the finish can follow the original character of the building, which matters in a listed district.
For a waterproofing rebuild, the wet area comes out: the shower tile, the backer behind it, and the pan. A tub in the same room can usually stay if the wall behind it is sound and its tile is not part of the scope.
We do not strip a room for the sake of it. If the dry-area tile is bonded and flat, it stays.
In most of them, moisture-resistant drywall and mastic, sometimes over a skim coat, on studs at sixteen inches. Water-resistant, not waterproof.
In the older houses it can be a mortar bed on metal lath, which is solid but also not waterproof, and heavy enough that it comes out in pieces. We know which one we are dealing with after the first day.
The tile and the waterproofing are exempt from a building permit under the state code. Plumbing is not: a new drain or a moved valve is permitted by the licensed plumber who does it.
Plainville no longer accepts paper permits. Every application goes through the town's ViewPoint Cloud system, and inspections are booked by calling the Building Department at 860-793-0221, ext. 7175. The office is at 1 Central Square, Room 100.
We build the pan, then go over it with a bonded waterproofing membrane such as a Schluter-KERDI style sheet or a liquid-applied one where the geometry calls for it.
The membrane runs over the pan, up the walls, around the curb, and over every seam, corner and valve penetration, and we hold a twenty-four-hour flood test before any tile goes down.
If a drop moves, we find it while it is still inexpensive to fix.
Only sometimes, and only when the old tile passes the checks: solidly bonded everywhere when you tap it, flat, and structurally sound, with enough give at the outlets, counters and doors to absorb the added thickness.
When it fails any of those, tiling over it locks the problem in. On a wet area we almost always take it down to the substrate instead.
Still have questions? Call us at (860) 990-2332
Guides
Waterproofing Questions, Answered
The questions homeowners ask us before the estimate. Read them before you book anyone, then call us with your questions.
Showers
What Goes Behind Shower Tile, and Why It Decides Whether the Shower Lasts
The pan, the membrane, the backer board, the grout and the tile. Five layers, and the one nobody sees is the one that decides how long the shower lasts.
Technical
Preparing a Subfloor for Tile
What a subfloor has to be before tile goes on, the common failures, and the tile problems that no amount of good tile can fix.
Permits
Do I Need a Permit for a Bathroom Remodel in Connecticut?
What the state code exempts, what needs a trade permit, and why a tile job and a plumbing job are not the same job. Read this before you pull anything off a wall.
How we work
Our Tile Installation Process, Step by Step
The whole sequence, from the first visit to the last silicone joint. Substrate prep, waterproofing, layout, setting, grout. No steps skipped.
More Tile Services in Plainville
The same careful work, for every surface in your Plainville home.
Waterproofing in Nearby Towns
Local crews, same standard, across Connecticut.

Shower Waterproofing in Plainville? Get Your Free Estimate.
If you are in New Britain, Berlin, Newington, Plainville, Farmington, Avon or a nearby Connecticut town and need tile installation, bathroom remodeling, shower waterproofing, backsplash work, or floor tile installation, contact DM tile LLC today. Free estimates available.







